Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| plan [2022/03/01 21:41] – [Deadlines] epsatisep | plan [2023/02/21 22:09] (current) – external edit 127.0.0.1 | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== | + | ====== |
| - | + | | |
| - | ===== Deadlines ===== | + | * 2023-03-08 Define the **Project Backlog** (what must be done and key deliverables - every member should preferably participate in every task), **Global Sprint Plan**, **Initial Sprint Plan** (which tasks should be included, who does what) and **Release Gantt Chart** of the project and insert them on the wiki (planning) |
| - | | + | * 2023-03-15 Upload the “black box” **System Diagrams** & **Structural Drafts** to the wiki |
| - | * 2022-03-16 Define the **Project Backlog** (what must be done and key deliverables - every member should preferably participate in every task), **Global Sprint Plan**, **Initial Sprint Plan** (which tasks should be included, who does what) and **Release Gantt Chart** of the project and insert them on the wiki (planning) | + | * 2023-03-22 Upload the **List of Components and Materials (what & quantity)** to the wiki |
| - | * 2022-03-23 Upload the “black box” **System Diagrams** & **Structural Drafts** to the wiki | + | * 2023-03-29 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure |
| - | * 2022-04-06 Upload the **List of Components and Materials (what & quantity)** to the wiki | + | * 2023-04-16 Upload the **Interim Report and Presentation** to the wiki. The report must contain the the following chapters: Introduction, |
| - | * 2022-04-12 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure | + | * 2023-04-20 Interim Presentation, |
| - | * 2022-04-14 Upload the **Interim Report and Presentation** to the wiki. The report must contain the the following chapters: Introduction, | + | * 2023-04-26 Upload the final **List of Materials (local providers & price, including VAT and transportation)**, and 3D model video to the wiki |
| - | * 2022-04-21 Interim Presentation, | + | * 2023-05-07 Upload refined Interim Report (based on Teacher & Supervisor Feedback) |
| - | * 2022-04-27 Upload the final **List of Materials (local providers & price, including VAT and transportation)** to the wiki | + | * 2023-05-24 Upload packaging solution to Deliverables and Report |
| - | * 2022-05-14 Upload refined Interim Report (based on Teacher & Supervisor Feedback) | + | * 2023-06-31 Upload the results of the **Functional Tests** to the wiki |
| - | * 2022-06-07 Upload the results of the **Functional Tests** to the wiki | + | * 2023-06-18 Upload the **Final Report, Presentation, |
| - | * 2022-06-18 Upload the **Final Report, Presentation, | + | * 2023-06-22 Final Presentation, |
| - | * 2022-06-23 Final Presentation, | + | * 2023-06-27: |
| - | * 2022-06-28: | + | |
| - Update the wiki, report, paper with all suggested corrections | - Update the wiki, report, paper with all suggested corrections | ||
| - Place in the files section of the MS Teams channel of your team a **folder with the refined deliverables (source + PDF) together with all code and drawings produced** | - Place in the files section of the MS Teams channel of your team a **folder with the refined deliverables (source + PDF) together with all code and drawings produced** | ||
| - Hand in to the EPS coordinator a **printed copy of the refined report and poster** | - Hand in to the EPS coordinator a **printed copy of the refined report and poster** | ||
| - | * 2022-06-30: | + | * 2023-06-29: |
| - Hand in the **prototype and user manual** to the client | - Hand in the **prototype and user manual** to the client | ||
| - Receive the **EPS@ISEP certificate** | - Receive the **EPS@ISEP certificate** | ||
| Line 25: | Line 24: | ||
| - | ===== Project Plan ===== | ||
| - | |||
| - | Define your optimal sprint duration and plan your sprints until project end using Global Sprint Plan Table {{ref> | ||
| - | |||
| - | <WRAP centeralign> | ||
| - | <table tlabel0> | ||
| - | < | ||
| - | <WRAP box 400px center> | ||
| - | ^ Sprint | ||
| - | | 1 | Start date | End date | ||
| - | | 2 | Start date | End date | ||
| - | | 3 | Start date | End date | | ||
| - | | 4 | Start date | End date | | ||
| - | | 5 | Start date | End date | ||
| - | | 6 | Start date | End date | | ||
| - | | 7 | Start date | End date | | ||
| - | </ | ||
| - | </ | ||
| - | </ | ||
| - | |||
| - | Build your project backlog, including all relevant tasks/ | ||
| - | Prioritize all backlog items (PBI), keeping higher priority items at the top, and lower priority at the bottom. | ||
| - | <WRAP centeralign> | ||
| - | <table tlabel1> | ||
| - | < | ||
| - | <WRAP box 400px center> | ||
| - | ^ PBI ^ Title ^ Status | ||
| - | | Z | Sample task | To do | | ||
| - | | K | Sample task | To do | | ||
| - | | D | Sample task | To do | | ||
| - | | A | Sample task | To do | | ||
| - | | B | Sample task | To do | | ||
| - | | E | Sample task | To do | | ||
| - | | C | Sample task | To do | | ||
| - | </ | ||
| - | </ | ||
| - | </ | ||
| - | |||
| - | Plan each sprint at its beginning (Sprint Planning session) using the Sprint Plan Table {{ref> | ||
| - | <WRAP centeralign> | ||
| - | <table tlabel3> | ||
| - | < | ||
| - | <WRAP box 400px center> | ||
| - | ^ Sprint | ||
| - | | 1 | Z | 2 | X and Y | X, Y, Z, W | | ||
| - | | 2 | K | 3 | Z | X, Y, Z, W | | ||
| - | | 3 | D | 1 | W, Y and Z | X, Y, Z, W | | ||
| - | | 4 | A | 1 | Y | X, Y, Z, W | | ||
| - | | 5 | B | 2 | Z and W | X, Y, Z, W | | ||
| - | | 6 | E | 4 | X and W | X, Y, Z, W | | ||
| - | | 7 | C | 2 | Y and Z | X, Y, Z, W | | ||
| - | </ | ||
| - | </ | ||
| - | </ | ||
| - | |||
| - | Review each sprint at its end and update each item status on the Progress Register Table {{ref> | ||
| - | <WRAP centeralign> | ||
| - | <table tlabel4> | ||
| - | < | ||
| - | <WRAP box 400px center> | ||
| - | ^ Sprint | ||
| - | | 1 | Z | X and Y | X, Y, Z, W | Done | | ||
| - | | 2 | K | Z | X, Y, Z, W | Done | | ||
| - | | 3 | D | W, Y and Z | X, Y, Z, W | Done | | ||
| - | | 4 | A | Y | X, Y, Z, W | Done | | ||
| - | | 5 | B | Z and W | X, Y, Z, W | In progress | | ||
| - | | 6 | E | X and W | X, Y, Z, W | In progress | | ||
| - | | 7 | C | Y and Z | X, Y, Z, W | In progress | | ||
| - | </ | ||
| - | </ | ||
| - | </ | ||
| - | Identify key project deliverables (when they will be started and completed) and build a release Gantt chart. See Figure {{ref> | ||
| - | <WRAP centeralign> | ||
| - | <figure flabel1> | ||
| - | {{: | ||
| - | < | ||
| - | </ | ||
| - | </ | ||